Monday, November 8, 2010

JUST POTPOURRI

Tomorrow night's Council agenda setting session has been put off to the following Monday night. Instead from 7 to 9PM the Council will conduct budget. Meeting from the agencies that handle financial operations of the city.

On a very serious note, which gives inside to how our government operates [that's the federal government] there was a most interesting article on the first page of Sunday's time about a special agency's sole practice is to increase the sale of cheese in this country.

Although one part of the government decries the use of cheese is a terrible source of increased cholesterol and other fats the system was this dangerous of heart disease etc., there is a division which is helping industries use more cheese similar products. One would think that if you love the overall health care system reform bills just published that no federal agency would be recommended as it did to Domino Pizza that should increase the amount of cheese in their pizza by 40% so that one slice would provide two thirds of the recommended allowable fats for each day.I

The the recommended change to the Domino pizzas strongly. reversed a decline in sales

This first week of November the temperature is been down to freezing or below for several days. We have been informed that the road repaving project of Watchung Avenue between Seventh Street and Hillside.Avenue will be completed by either the last week in November or the first week in December at the latest.

One can only hope that this year there will not be a repeat of the fiasco of Kensington Avenue, that the weather stays dry and the temperatures rise above 40 Fahrenheit which is the lowest temperature at which asphalt can be poured. At any lower temperature the binding of the body to the subsurface is questionable. And at this low temperature the road may fail sooner than the average life span.

Of course permanency of the new pavement depends upon the aggregates used. Also there are various types designed for the load and wear the pavement will have to bear. Good engineering will determine what is best for the side streets or a main artery like Watchung Ave. without compromising life expectancy.

It is too late that we do not take into account the best time to do repavements or do not do proper maintenance of our existing roads.

No comments:

Post a Comment